The Town of Cheshire maintains an aggressive pavement maintenance program. In 2024, we will utilize three maintenance methods to preserve the quality of the Town’s roadway infrastructure: Crack Sealing, Chip Sealing, and Mill and Paving. These road treatments will be applied to the roads selected, which were vetted through the pavement management system and confirmed by Engineering staff in the field.
The candidates for the proposed 2024 Road Maintenance and Paving are subject to change for reasons including, but not limited to, further cost analysis and other road segments becoming an immediate priority due to pavement deterioration.
Proposed 2024 Road Repavement (Mill and Overlay)
Name
From
To
Length (FT)
Sandstone Cir
Blacks Rd
1251
Sable Ct
Cul-de-Sac
437
Stony Hill Rd
Highland Ave (RT 10)
Country Club Rd
1267
Stony Hill Cir
347
Highview Terrace
Waterbury Rd
Rice Ave
1359
Waterbury Rd (RT 70)
1105
Dogwood Dr
South Rolling Acres
Dead End
895
East Connector
Blue Ridge Cir
400
Hemlock Ridge Rd
Oak Ave
640
Bear Path Ct
625
Frances Ct
1027
Edwards Rd
Cornwall Ave
Spring St
1369
Sheila Ln
373
Far Horizon Dr
Williamsburg Dr
Carriage Dr
2760
Village Dr
Northwood Ct
2310
Sperry Rd
Cook Hill Rd
Brittany Ct
2476
Proposed 2024 Chip Seal
*
Diana Ct
Burton Dr
1103
Surrey Dr
1381
Carriage Rd
2543
Wallingford Rd
588
Vanessa Ct
1585
Farview Dr
Summit Rd (N)
Summit Rd (S)
1762
King Rd
S Main St (RT 10)
N Brooksvale Rd (RT 42)
2066
Lanyon Dr
3108
Plank Rd
Waterbury TL
Notch Rd
7509
Summit Rd
Summer Hill Rd
3137