Projects

Current Projects


Farmington Canal Trail Improvements

Cornwall Avenue to West Main Street - This portion of the trail will be designed and constructed by the State of Connecticut Department of Transportation. Work began in spring 2017 and should be complete in the fall 2018.

Click here to see a map of the project.


Past Projects

East Johnson Avenue Bridge

The existing East Johnson Avenue Bridge over the Quinnipiac River was replaced during the summer and fall of 2016.

Bridge


West Main Sidewalk Installation

The Town of Cheshire constructed sidewalks on the north side of West Main Street between Grove Street and Maple Avenue. The project included approximately 1,600 feet of new sidewalk as well as a four foot high retaining wall on the westerly end of the project.

The project was funded in full by a grant from the CT Department of Economic and Community Development.

Before/After photos looking east from Waverly Street:

Before Sidewalk InstallationAfter Sidewalk Installation


Before/After photos looking across Rt. 10 from Warren Street:

Before Sidewalk Installation

After Sidewalk Installation



Creamery Road Bridge

The existing Creamery Road bridge over Honeypot Brook was replaced during the summer of 2015.

Creamery Road Bridge


Blacks Road Bridge

The existing Blacks Road Bridge over Honeypot Brook was replaced during the summer of 2014.

Blacks Road Bridge


South Brooksvale Road Culvert

The existing South Brooksvale Road culvert over Sanford Brook was replaced during the summer of 2013.

South Brooksvale Road Culvert